Projects Archive - Weitz https://www.weitz.com/projects/ Build a Better Way.™ Wed, 11 Jun 2025 21:09:17 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.1 Kansas City International Airport New Terminal https://www.weitz.com/projects/kansas-city-international-airport/ Sat, 01 Feb 2025 12:09:31 +0000 https://weitz.wpengine.com/?post_type=project&p=3656 The Weitz Company is part of the design-build joint venture team constructing the new, $1.5 billion single terminal at Kansas City International Airport in Kansas City, Mo. It will be built in the footprint of the airport’s existing Terminal A that was previously decommissioned. When complete, the facility will open with 39 gates on two concourses with the ability to expand up to 50 gates in the future. Additional project scope includes a 6,300-space parking structure, 15,000-square-foot central utility plant and landside and...

The post Kansas City International Airport New Terminal appeared first on Weitz.

]]>
The Weitz Company is part of the design-build joint venture team constructing the new, $1.5 billion single terminal at Kansas City International Airport in Kansas City, Mo. It will be built in the footprint of the airport’s existing Terminal A that was previously decommissioned. When complete, the facility will open with 39 gates on two concourses with the ability to expand up to 50 gates in the future. Additional project scope includes a 6,300-space parking structure, 15,000-square-foot central utility plant and landside and airside improvements.

At just over 1 million square feet, the new terminal is the largest, single infrastructure project in Kansas City’s history. It will have a profound and lasting economic impact on the region in the form of new jobs, opportunities for local and small businesses and a world-class traveler experience for airport users. Expected to open in early 2023, the new terminal will replace Kansas City International’s aging B and C terminals, which were built in 1972.

This project is being delivered via a public-private partnership. The project has been awarded LEED Gold certification, making Kansas City International Airport’s New Terminal the largest airport in the U.S. to achieve this status.

Read about how Weitz implemented a full 3D BIM (Building Information Management) model for both Design and Construction, by request of the Kansas City Aviation Department here.

Photos credited to Clark | Weitz | Clarkson.

The post Kansas City International Airport New Terminal appeared first on Weitz.

]]>
Des Moines International Airport New Terminal  https://www.weitz.com/projects/des-moines-international-airport-new-terminal/ Sat, 01 Feb 2025 12:08:13 +0000 https://www.weitz.com/?post_type=project&p=6829 The Weitz Company is part of the CMaR joint venture team constructing the new $450 million terminal at Des Moines International Airport in Des Moines, IA. The airport is undergoing a total transformation of the facility to add to the airport’s existing footprint.   At just over 265,000 sq ft, the new terminal includes ticketing, an updated and more efficient outbound/inbound baggage handling system and screening, security, offices, concessions, support areas, and a connection to the existing concourse. When complete,...

The post Des Moines International Airport New Terminal  appeared first on Weitz.

]]>
The Weitz Company is part of the CMaR joint venture team constructing the new $450 million terminal at Des Moines International Airport in Des Moines, IA. The airport is undergoing a total transformation of the facility to add to the airport’s existing footprint.  

At just over 265,000 sq ft, the new terminal includes ticketing, an updated and more efficient outbound/inbound baggage handling system and screening, security, offices, concessions, support areas, and a connection to the existing concourse. When complete, the new terminal building will offer a skyway bridge to the parking garage, a connection to the existing concourse, a new energy plant, and a new office building. Five aircraft gates will be built in addition to the existing gates. 

“Our CMaR approach goes beyond only crunching the numbers. As a CMaR, we engage in open design dialog to help inform project details and the project budget to achieve the desired solution.” – Dan Solem, Project Executive for Weitz|Turner – Des Moines International Airport  

The new terminal will include upgraded technology and improved sustainability. It will take the airport to new heights, featuring charming airfield views. It will have a long-lasting economic impact as the Central Iowa region continues to grow while attracting new businesses and talents, making connectivity a vital component. 

The post Des Moines International Airport New Terminal  appeared first on Weitz.

]]>
PHX Sky Train Stage 2 – Maintenance & Storage Facility https://www.weitz.com/projects/phx-sky-train-stage-2-maintenance-storage-facility/ Sat, 01 Feb 2025 12:07:31 +0000 https://www.weitz.com/?post_type=project&p=4467 PHX Sky Train Stage 2 – MSF is the expansion of the system’s maintenance and storage facility to accommodate Stage 2 Operations. The addition to the existing facility includes two light maintenance bays, one medium bay and pits, new elevated platforms for the maintenance bays, new office for technician managers, heavy storage area, and a new work shop. Full compressed air runs throughout the entire building and to several locations in the yard. Air conditioning was added to the existing...

The post PHX Sky Train Stage 2 – Maintenance & Storage Facility appeared first on Weitz.

]]>
PHX Sky Train Stage 2 – MSF is the expansion of the system’s maintenance and storage facility to accommodate Stage 2 Operations. The addition to the existing facility includes two light maintenance bays, one medium bay and pits, new elevated platforms for the maintenance bays, new office for technician managers, heavy storage area, and a new work shop. Full compressed air runs throughout the entire building and to several locations in the yard. Air conditioning was added to the existing and the new maintenance bays and pits. In addition to the expansion, the existing light maintenance bay will be converted to a heavy maintenance bay.

A new train wash was constructed that will allow the facility to wash the fleet of cars twice a week without adding additional crews for this operation. A water conservation system was installed which will allow the train wash to utilize 70% recycled water.

Additional cars were added to the existing fleet requiring 5,800 lineal feet of added guideway and running surface to be installed throughout the yard.

The post PHX Sky Train Stage 2 – Maintenance & Storage Facility appeared first on Weitz.

]]>
DEN Sunset Loop https://www.weitz.com/projects/den-sunset-loop/ Sat, 01 Feb 2025 12:06:09 +0000 https://www.weitz.com/?post_type=project&p=7637 The Weitz Company has been chosen by hospitality group OTG to construct a new food and beverage concept within Denver International Airport’s Concourse B. The new project will include the ‘Sunset Loop Bar & Grill’ along with a new grab-and-go Market, as well as a renovation to the Starbucks Coffee. This one-of-a-kind Sunset Loop Bar & Grill will offer all-day dining with elevated, health-conscious cuisine options, and traditional American fare with a locally sourced menu. In addition to the extensive...

The post DEN Sunset Loop appeared first on Weitz.

]]>
The Weitz Company has been chosen by hospitality group OTG to construct a new food and beverage concept within Denver International Airport’s Concourse B. The new project will include the ‘Sunset Loop Bar & Grill’ along with a new grab-and-go Market, as well as a renovation to the Starbucks Coffee. This one-of-a-kind Sunset Loop Bar & Grill will offer all-day dining with elevated, health-conscious cuisine options, and traditional American fare with a locally sourced menu. In addition to the extensive bar seating and comfortable dining tables, the Loop Bar & Grill will have a 67-foot-long Sunset Market containing locally sourced products and prepared foods for travelers in a hurry in addition to housing a communal seating area where guests can order dishes from the restaurant’s menus while waiting at nearby gates.

OTG’s new hospitality concepts will enable customers to place their food and beverage orders through a mobile platform across all OTG restaurants and retail markets.

The post DEN Sunset Loop appeared first on Weitz.

]]>
Daniel K. Inouye International Airport Consolidated Rent-A-Car Facility (HNL CONRAC) https://www.weitz.com/projects/daniel-k-inouye-international-airport-consolidated-rent-a-car-facility-hnl-conrac/ Sat, 01 Feb 2025 12:05:14 +0000 https://www.weitz.com/?post_type=project&p=7283 Contracted to Weitz’s sister company, Contrack Watts, the new Consolidated Rent-A-Car Facility (CONRAC) at Daniel K. Inouye International Airport (HNL) in Honolulu, Hawaii, significantly increases efficiency and security to better serve rental car companies and their customers. To construct the 1.8-million-square-foot facility, the existing car rental buildings were demolished to make way for the five-level, cast-in-place concrete structure that now provides vehicular parking areas, rental agency areas, office spaces, car wash equipment and commercial fueling stations. In total, the CONRAC...

The post Daniel K. Inouye International Airport Consolidated Rent-A-Car Facility (HNL CONRAC) appeared first on Weitz.

]]>
Contracted to Weitz’s sister company, Contrack Watts, the new Consolidated Rent-A-Car Facility (CONRAC) at Daniel K. Inouye International Airport (HNL) in Honolulu, Hawaii, significantly increases efficiency and security to better serve rental car companies and their customers.

To construct the 1.8-million-square-foot facility, the existing car rental buildings were demolished to make way for the five-level, cast-in-place concrete structure that now provides vehicular parking areas, rental agency areas, office spaces, car wash equipment and commercial fueling stations. In total, the CONRAC includes 2,250 parking stalls.

The 22-acre project was sequentially phased in Steps A, B and C. Step A was completed and ready for occupancy in December 2019. The entire project, which is LEED Gold certified, was completed in December 2021.

The post Daniel K. Inouye International Airport Consolidated Rent-A-Car Facility (HNL CONRAC) appeared first on Weitz.

]]>
Creekstone Wastewater Treatment Expansion & Upgrades https://www.weitz.com/projects/creekstone-wastewater-treatment-expansion-upgrades/ Sat, 01 Feb 2025 12:04:28 +0000 https://www.weitz.com/?post_type=project&p=6487 In 2020, Creekstone Farms Premium Beef, LLC partnered with The Weitz Company to double their production capacity through various facility upgrades. Key enhancements included new site access, bone grind operations, cattle pen expansion, welfare addition, stormwater management expansion, and wastewater treatment expansion and upgrades. Central to this effort was the wastewater treatment expansion and upgrades, vital for meeting increased production demands and future environmental regulations. The project focused on removing animal byproducts from water, aligning with NPDES requirements. The wastewater...

The post Creekstone Wastewater Treatment Expansion & Upgrades appeared first on Weitz.

]]>
In 2020, Creekstone Farms Premium Beef, LLC partnered with The Weitz Company to double their production capacity through various facility upgrades. Key enhancements included new site access, bone grind operations, cattle pen expansion, welfare addition, stormwater management expansion, and wastewater treatment expansion and upgrades.

Central to this effort was the wastewater treatment expansion and upgrades, vital for meeting increased production demands and future environmental regulations. The project focused on removing animal byproducts from water, aligning with NPDES requirements.

The wastewater treatment project was carefully phased and sequenced to minimize operational disruptions, ensuring uninterrupted production. This strategic approach emphasized operational efficiency and seamless integration, enhancing productivity and environmental compliance for Creekstone Farms Premium Beef, LLC.

Wastewater Treatment Components:

  • Pretreatment building expansion: Expanded infrastructure for new equipment and processes.
  • Pretreatment equipment installation: Installed specialized equipment to remove contaminants from wastewater.
  • Pen waste gravity clarifier: Designed for solid waste separation via gravitational settling.
  • Pre-anoxic basin: Supported initial biological treatment stages in an oxygen-deprived environment.
  • Aeration basin expansion: Increased capacity for aerobic treatment processes.
  • Additional lagoon: Expanded storage capacity for more efficient treatment.
  • Tertiary system addition: Implemented for stringent water quality standards.
  • Final clarifier addition: Separated solids from treated water for clarity and purity.
  • Sludge holding optimization: Enhanced management of generated sludge for efficiency.
  • MCC expansion: Expanded motor control center infrastructure for increased demands.
  • Dewatering expansion with dedicated building: Provided facilities for sludge dewatering and staff operations.

These enhancements collectively ensured that the wastewater treatment system could effectively remove animal byproducts from the water, meeting regulatory standards and safeguarding environmental quality.

The post Creekstone Wastewater Treatment Expansion & Upgrades appeared first on Weitz.

]]>
Confidential Data Center Campus (Iowa) https://www.weitz.com/projects/confidential-data-center/ Sat, 01 Feb 2025 12:03:07 +0000 https://weitz.wpengine.com/?post_type=project&p=3740

The post Confidential Data Center Campus (Iowa) appeared first on Weitz.

]]>
This 192-megawatt data center campus consists of the simultaneous construction of two building shells, power distribution centers and the build-out of collocation space in each building. Our project scope includes all site work for the greenfield building complex that will total 964,000 square feet.

The post Confidential Data Center Campus (Iowa) appeared first on Weitz.

]]>
Confidential Data Center (Virginia) https://www.weitz.com/projects/confidential-data-center-virginia/ Sat, 01 Feb 2025 12:02:33 +0000 https://www.weitz.com/?post_type=project&p=6739 96 Mega Watt, two building data center, on a brand new campus. This project includes two building shells, power distribution centers and all site work. This site has strict security protocols and safety for all project personnel.

The post Confidential Data Center (Virginia) appeared first on Weitz.

]]>
96 Mega Watt, two building data center, on a brand new campus. This project includes two building shells, power distribution centers and all site work. This site has strict security protocols and safety for all project personnel.

The post Confidential Data Center (Virginia) appeared first on Weitz.

]]>
University of Florida New Undergraduate Residential Complex with Honors College https://www.weitz.com/projects/university-of-florida-new-undergraduate-residential-complex-with-honors-college/ Sat, 01 Feb 2025 12:01:17 +0000 https://www.weitz.com/projects/lantana-branch-library-renovation-2/ Located along Museum Road in Gainesville, Florida, the University of Florida’s New Undergraduate Residential Complex with Honors College is intended to promote a sense of community amongst students and Honors program staff. This state-of-the-art facility features four residence halls, 5-6 stories each, and a one-story common space building to create the five building complex. The residential buildings house a combination of single and double suites, including ADA suites, for a total of 1,415 beds (825 units). The residential complex also...

The post University of Florida New Undergraduate Residential Complex with Honors College appeared first on Weitz.

]]>
Located along Museum Road in Gainesville, Florida, the University of Florida’s New Undergraduate Residential Complex with Honors College is intended to promote a sense of community amongst students and Honors program staff. This state-of-the-art facility features four residence halls, 5-6 stories each, and a one-story common space building to create the five building complex. The residential buildings house a combination of single and double suites, including ADA suites, for a total of 1,415 beds (825 units). The residential complex also includes academic support spaces, faculty offices, reading room, maker studio, gaming lounge, ensemble practice room, art studio, mindfulness/meditation suite, Great Lawn with outdoor amenities, and Great Hall with convertible space for a lecture hall, lounge, cocktail reception, or banquet-style event.

Learn how physical mockups played a vital role in the success of this project here.

The post University of Florida New Undergraduate Residential Complex with Honors College appeared first on Weitz.

]]>
Iowa State University College of Veterinary Medicine – Veterinary Diagnostic Laboratory Phase I https://www.weitz.com/projects/iowa-state-university-college-of-veterinary-medicine-veterinary-diagnostic-laboratory/ Sat, 01 Feb 2025 12:00:59 +0000 https://www.weitz.com/projects/611-5th-ave-the-weitz-company-orascom-usa-corporate-headquarters-2/ This project included the design and construction of a new two story stand-alone Veterinary Diagnostic Laboratory (VDL) building on the College of Veterinary Medicine campus at Iowa State University. Iowa State’s VDL is a national leader in protecting animal and human health with laboratories in the space processing upwards of 120,000 cases each year and conducting more than 1.5 million tests annually. This lab is fully accredited by the American Association of Veterinary Laboratory Diagnosticians. The VDL provides diagnostic services...

The post Iowa State University College of Veterinary Medicine – Veterinary Diagnostic Laboratory Phase I appeared first on Weitz.

]]>

This project included the design and construction of a new two story stand-alone Veterinary Diagnostic Laboratory (VDL) building on the College of Veterinary Medicine campus at Iowa State University.

Iowa State’s VDL is a national leader in protecting animal and human health with laboratories in the space processing upwards of 120,000 cases each year and conducting more than 1.5 million tests annually. This lab is fully accredited by the American Association of Veterinary Laboratory Diagnosticians. The VDL provides diagnostic services for animals including necropsy, bacteriology, serology, histopathology, virology, parasitology, molecular diagnostics, and toxicology as well as offering analytical services.

The building includes specialized laboratory spaces with specific functions or processes. The remaining lab spaces are flexible and separated allowing the labs to quickly adapt to changing users’ needs and/or research goals.

Iowa State University College of Veterinary Medicine hosts beam signing with The Weitz Company

 